Scope of Work

Family Dollar General Scopes of Work for Subcontractors

NOTE: SCOPE OF WORK SHOULD FOLLOW PLANS AND SPEC ALONG WITH HJB REQUIRMENTS

Concrete

Subcontractor is responsible for providing but not limited to the following:

  • Layout for concrete pad only (preset corners by others)
  • Form and place continuous footings/spread footings including all necessary excavation and ground prep work
  • Rebar, wall ties, and all reinforcing materials for all footings
  • Fine grade fill sand (provided by others), provide/install 10mil vapor retarder, install 1.4 wwm, provide/set formwork, provide/install wire mesh and all reinforcing materials, and provide/place/finish 4” 3500 psi concrete for slab-on-grade
  • Slab-on-grade must meet finish requirements of (FF) 40 +/-5 – (FL) +/-5 to be tested by certified concrete testing agency
  • Saw cut control joints for slab-on-grade using early entry saw
  • Install miscellaneous embeds including but not limited to angle iron, anchor bolts, weld plates

(provided by others)

  • Remove forms and clean up job site of Trade’s materials and trash

Electrical

Subcontractor is responsible for providing the following:

  • Temporary power and lighting
  • Install all conduit, boxes and supports for all electrical circuits
  • Install all wire, switches and receptacles
  • Install conduit and wire to HVAC
  • Install electrical panels per plans
  • Install breakers
  • Install breaker lock outs for breaker called out on plans
  • Install junction box above the ceiling for all lighting controlled by Venstar.  Wires should pass through JB to panel
  • Install light fixtures
  • Install grounding
  • Rough in for low voltage systems
  • Install low voltage cable tray
  • Feeder cables for electrical distribution equipment as shown on the one line diagram
  • Include 100’ of conduit and cable for underground service
  • Light pole bases and conduits
  • Lightning protection
  • MC type cable used throughout the project
  • Conduit stub for data/telephones (wiring and install by others)
  • Conduit run for street sign
  • Doorbell and horn for receiving door
  • Electrician is responsible for compaction of Their trenches on and off the building pad
  • Electrician is responsible for providing the necessary equipment to install underground electrical per the plans
  • Daily Cleanup of trades' trash and material
  • ALL LIGHTING FIXTURES ARE SUPPLIED BY THE GENERAL CONTRACTOR ON FAMILY DOLLAR PROJECTS
  • VENSTAR WILL BE PROVIDED AND INSTALLED BY OTHERS

Mechanical

Subcontractor is responsible for providing but not limited to the following:

  • Material and installation for all ductwork, smoke detectors, electric unit heaters, bathroom fans and fresh air vents per plans
  • Provide and install HVAC units per plans
  • Installation of A/C grills and diffusors.  Diffusors cannot be below light fixtures
  • Wire in low voltage wiring to thermostats and run refrigeration lines to all units
  • Install gas lines per plans
  • Daily Cleanup of Trade’s materials and trash

Plumber

Subcontractor is responsible for providing but not limited to the following:

  • Install and furnish complete building water and sewer system per the plans and spec
  • Install and furnish water heater per plans
  • Install and furnish all lavatories, faucets and sinks per the plans and specs
  • Install and furnish all floor drains and floor sinks per the plans and specs
  • All water lines shall be copper per the plans
  • Install plumbing roof vents per the plans
  • Plumber is responsible for compaction of Trade’s trench’s, on and off the building pad
  • Furnish all labor and equipment to install a complete building water and sewer system per plans and spec
  • Daily Cleanup of Trade’s materials and Trash

Storefront

Subcontractor is responsible for providing but not limited to the following:

  • Install and furnish Aluminum entrance and storefront per the plans
  • Install and furnish storefront doors and frame with adjustable closers
  • Install and furnish offset pivot, standard push/pull handles, surface mounted closers, and hook bolt lock set per plans and specs
  • Install storefront glass per plans and specs
  • Install crash bars on exterior and exterior of door per plans
  • Install brush sweeps on store front doors
  • Caulk store from, break metal and threshold
  • Cleanup of Trade’s materials and trash

Metal Building Erector

Subcontractor is responsible for providing but not limited to the following:

  • INVENTORY metal building package to ensure no damage or missing pieces
  • Provide all necessary hoisting equipment and labor required to erect metal pieces.
  • Install weather tight roof system per manufactures specification
  • Furnish all welding equipment
  • Install door frames and doors per plans
  • Install siding and gutter system per plans
  • Install front awning and site door awning per plans
  • Coordinate roof warranty inspection with GC if required
  • Caulk all necessary metal to insure water tightness
  • Building Erector is responsible for tighting all bolts in order to pass inspection
  • Daily cleanup of Trade’s material and trash

Site work

Subcontractor is responsible for providing but not limited to the following:

  • All equipment necessary for clearing and demolition of existing utilities and materials
  • All equipment necessary for removing and hauling unsuitable soil as well as hauling, distributing and grading new soil.
  • All equipment necessary for paving parking lots and asphalt walkways within the boundaries of the site.
  • Removal of existing curbs, gutters, light poles and road signs per plans and specs
  • Haul, distribute, grade, and compact new soil per plans and specs
  • Install all curbing, granite stone base and crushed stone base per plans and specs
  • Install asphalt and concrete pavement in parking lot and sidewalks per plans and specs
  • Install concrete walkways and handicap detectable areas
  • Install concrete dumpster pad
  • Install steel bollards filled with concrete per plans and specs
  • Install all striping and signage per plans and specs
  • Furnish and install silt fence, inlet protection, construction entrance and rip rap necessary for soil erosion and sedimentation control Per the Plans
  • SITE CONTRACTOR IS RESPONSIBLE FOR THE MAINTANCE OF
  • Furnish and install new storm drainage system per plans and specs
  • Furnish and install new sanitary sewer system per plans and specs
  • Furnish and install new water distribution system per plans and specs
  • Digging and forming of retention pond per plans and specs
  • Tie-in from building to new sanitary sewer and water systems provided by others
  • Maintaining construction entrance
  • Furnish and install all conduit sleeves, (including irrigation)
  • Provide grass stabilization  in/and around ponds

Landscape

Subcontractor is responsible for providing the following:

  • Material and installation of all trees, shrubs, plants, grass, topsoil and mulch per landscape plan
  • All pipe, electrical materials and hookup for irrigation lines per plans/specs

All sprinkler heads and fittings per plans/specs

NATIONAL RETAIL

SINGLE TENANT RETAIL

UP-FIT / REMODEL

DESIGN - BUILD